Full tailing high concentration filling equipment general contract project



Project Description


The vertical sand silo is used to concentrate and settle all tailings, and the filling mass concentration is 66%-70%. The total capacity of the filling system is 540m³/h (four sets of systems, three uses and one standby).



Project Outcome


Through the personalized design of the electrical and hydraulic system of the equipment, the continuous and stable operation of the equipment in the plateau and cold environment (+4820m) is guaranteed.